Customer Success Story
Performance sharing of high-efficiency and energy-saving solutions
In 2024, we successfully optimize the cooling water circulation system for a large steel plant in southern of Taiwan, replacing three 200-ton/hr pumps to install the Wilo GIGA-N high-efficiency pump.
The energy consumption of the system was reduced by 34%, saving about NT$510,000 in electricity cost per year.
At the same time, it also greatly reduces the noise of equipment operation and improves the working environment.
- Application industry: steel industry
- Application areas: cooling water system
- Solution: Wilo GIGA-N
- Hydraulic optimization: optimize pump head design